The only cloud TMS with full accounting built in.
When you run a TMS from one company and accounting from another, you’re doing everything twice, and the two systems never equal each other. Never. Worse still, neither one lets you open more than one page at a time.
ProBuilt is the better way. Not a sync to QuickBooks. Not an export. Billing, payables, payroll, bank reconciliation and the general ledger, in the same system as your dispatch.
A motion graphic of one load’s money moving through ProBuilt TMS, window by window, as a line of light. Load order 48214 for Cedar Ridge Lumber is delivered for 580.30. Invoice 3307 comes from the load for the same 580.30 and is emailed to Cedar Ridge Lumber, who pays through Stripe. The payment lands in bank account 10000 and the invoice is paid. The general ledger shows the postings, the receivable and the revenue from the invoice and the payment into the bank, and the profit and loss shows the freight and accessorial revenue. The line runs unbroken through every window: entered once, everywhere at once. Then the shop’s bill takes the same trail: work order 1183 for truck 2117, bill 20448 for 2,055.55, paid electronically from the bank with bill payment 1042, posted in the general ledger and shown on the profit and loss as truck maintenance expense.
01Billing and receivables.
Bill it from the load. Get paid sooner.
ProBuilt produces and emails your invoices and collects electronic payments. It has several kinds of automated billing, collections tools and receivables analysis built in. With multitasking, a departmentalized structure and its interface with Stripe, your billing and receivables get faster and more accurate.
Bill a load. Or let it run on its own.
Customer
1200 Timber Road
Nacogdoches, TX 75961
Delivered
Stops
| # | Date Fr/To | Time Fr/To | PD | Company | Address | City, St |
|---|---|---|---|---|---|---|
| 1 | 9/22 | 07:00-09:00 | SHIP | Cedar Ridge Lumber | 1200 Timber Road | Nacogdoches, TX |
| 2 | 9/22 | 13:00-16:00 | CONS | Trinity Builders Supply | 2700 Lone Star Drive | Dallas, TX |
Commodities
| Code | Description | Reference | Pieces | Weight | Class | Hazmat |
|---|---|---|---|---|---|---|
| LUMBER | 2x6 SYP #2 16' | 22.00 | 44,000 | |||
Charges
| Code | Reference | Rate By | Rate | Units | Total | Payable | Notes |
|---|---|---|---|---|---|---|---|
| Freight | Flat | 505.30 | 505.30 | ||||
| Tarp | Flat | 75.00 | 75.00 | ||||
- Pieces
- 22.00
- Weight
- 44,000
- Freight
- 505.30
- Accessorials
- 75.00
- Total Revenue
- 580.30
Input: 9/21/26 2:14 PMBy: OrtizEdited: 9/22/26 6:05 AMBy: Ortiz
1200 Timber Road
Nacogdoches, TX 75961
1200 Timber Road
Nacogdoches, TX 75961
| Item | Description | Qty | Units | Rate | Total | Memo |
|---|---|---|---|---|---|---|
| FREIGHT | Freight | 1.00 | EA | 505.30 | 505.30 | |
| TARP | Tarp Freight | 1.00 | 75.00 | 75.00 | ||
| Subtotal | Sales Tax | Total | Balance | Order |
|---|---|---|---|---|
| 580.30 | 0.00 | 580.30 | 580.30 | 48214 |
Trans No: 5371Input: 9/23/26 8:02 AMBy: Webb
Invoice 3307 bills load 48214’s own charges: freight 505.30 and the tarp, 75.00.
- Automated billing.Several kinds of it, so your invoices come from the loads you’ve already entered, not from typing them in again.
- Collections and analysis.Collections tools and receivables performance analysis, in the same system as the loads behind the money.
- Paid through Stripe.ProBuilt’s interface with Stripe collects electronic payments against your invoices.
02Accounts payable.
Pay on terms. Post on time.
ProBuilt manages your vendors, bills and payments. Its features post electronic payments on time and help you manage the bills you receive with terms, so paying them is efficient and accurate.
Pay a bill. Or let it run on its own.
Maintenance
Truck 2117 · transmission service
Gulf Coast Diesel Repair
Finished2,055.55
Bank
Gulf Coast Diesel RepairBill payment 1042 · ACH−2,055.55
Lone Star Fleet SupplyBill payment 1041 · ACH−642.30
Lone Star Truck & TrailerBill payment 1040 · ACH−1,236.40
Bayou City Truck PartsBill payment 1039 · ACH−412.60
Gulf Coast Diesel Repair
8120 Clinton Dr
Houston, TX 77029
| Account | Charge To | Amount | Reference | Location | Memo |
|---|---|---|---|---|---|
| 45000 | Gulf Coast Diesel Repair | 2,055.55 | WO 1183 | Truck 2117 · transmission service | |
| Total | Balance |
|---|---|
| 2,055.55 | 2,055.55 |
Trans No: 5402Input: 9/24/26 3:12 PMBy: WebbEdited: 10/20/26 9:05 AMBy: WebbLock: Payment
| Date | Vendor | A/P Acct | Payment | Pmt No | Amount | Memo |
|---|---|---|---|---|---|---|
| 10/16/26 | Bayou City Truck Parts | 21000 | ACH | 1039 | 412.60 | INV 88214 |
| 10/16/26 | Lone Star Truck & Trailer | 21000 | ACH | 1040 | 1,236.40 | WO 1180 |
| 10/19/26 | Lone Star Fleet Supply | 21000 | ACH | 1041 | 642.30 | PO 588 |
| 10/20/26 | Gulf Coast Diesel Repair | 21000 | ACH | 1042 | 2,055.55 | Bill 20448 |
Total: 2,291.30
The books
| Account | Debit | Credit |
|---|---|---|
| 45000 Truck Maintenance Expense | 2,055.55 | |
| 21000 Accounts Payable | 2,055.55 | |
| 21000 Accounts Payable | 2,055.55 | |
| 10000 Bank Account | 2,055.55 |
Truck 2117’s transmission job, finished in ProBuilt Maintenance, comes in as a bill with its terms: due 10/24/26.
- Bills with terms.Every bill carries its due date and its discount date, so you pay it on its terms.
- Electronic payments.Pay your vendors electronically, and each payment posts against the bill it pays.
- From the shop to the books.Outside repair bills from ProBuilt Maintenance land in payables with the work order they came from.
03Cash and credit.
Always up to date. Always reconciled.
ProBuilt Accounting cuts the work of keeping your bank and credit card accounts updated and reconciled. With multitasking, intelligent data import and automated postings, it keeps management on top of the cash that runs your business.

- 10/02Driver pay run 412, direct deposit−4,152.52
- 10/05Harborview Produce Co., invoice 3305+1,276.00
- 10/15Ridgeline Fleet Insurance, payment 1038−8,000.00
- 10/20Gulf Coast Diesel Repair, bill payment 1042−2,055.55
- 10/21Copperline Beverage, invoice 3308+450.00
04Payroll.
Your drivers ran the loads. Payroll already knows.
ProBuilt runs full-service payroll, and your drivers’ pay is calculated from the loads they ran. Our interface with Check Technologies adds federal and state tax calculations, tax reporting and payments, and year-end tax documents for each person. And your people get their own online portal for pay statements and time-off requests.
Pick a driver. Or let it run on its own.
Alvarez ran five loads, paid by the mile, with a safety bonus and a fuel advance paid back. Net pay: 790.28.
- 941s, 940s, W‑2s and 1099s.Tax reporting and payments, deposits and returns, and the year-end forms for everyone on payroll.
- Direct deposit.Pay goes straight to your people’s bank accounts.
- A portal for your people.Pay statements and time-off requests, online, for everyone on payroll.
05Financial statements.
Every report drills down. All the way to the load.
Customizable, accurate and extensive financial reporting: profit and loss, balance sheet, cash flows, the general ledger and more, with drill-down in every report. Every other cloud TMS opens one page at a time, so following a number means leaving the report. In ProBuilt, every step opens beside the last.
Follow a number. Or let it run on its own.
Filter
From: 1/1/2026 To: 10/22/2026
Income
Freight Revenue3,834,180.40
30020Accessorial Revenue205,175.00
30050Invoice Discounts/Write-Offs-10,286.40
Total Income4,029,069.00
Operating Expenses
Truck Maintenance Expense241,734.92
50010Driver Pay1,251,940.20
50020Fuel978,241.15
50030Tolls and Scales46,537.95
50050Insurance263,500.00
50060Equipment Leases570,000.00
50070General and Administrative428,215.85
Total Operating Expenses3,780,170.07
Net Income248,898.93
| Date | Name | Type | Reference | Amount | Memo |
|---|---|---|---|---|---|
| 09/22/26 | Pioneer Hardware Wholesale | Invoice | 3301 | 760.00 | Load 48206 |
| 09/22/26 | Stonegate Quarry | Invoice | 3303 | 395.00 | Load 48205 |
| 09/22/26 | Prairie Gold Milling | Invoice | 3304 | 640.00 | Load 48210 |
| 09/22/26 | Harborview Produce Co. | Invoice | 3305 | 1,180.00 | Load 48207 |
| 09/23/26 | Cedar Ridge Lumber | Invoice | 505.30 | Load 48214 | |
| 09/23/26 | Copperline Beverage | Invoice | 3308 | 410.00 | Load 48212 |
| 09/24/26 | Red River Paper Co. | Invoice | 3310 | 860.00 | Load 48216 |
Total: 3,834,180.40
1200 Timber Road
Nacogdoches, TX 75961
1200 Timber Road
Nacogdoches, TX 75961
| Item | Description | Qty | Units | Rate | Total | Memo |
|---|---|---|---|---|---|---|
| FREIGHT | Freight | 1.00 | EA | 505.30 | 505.30 | |
| TARP | Tarp Freight | 1.00 | 75.00 | 75.00 | ||
| Subtotal | Sales Tax | Total | Balance | Order |
|---|---|---|---|---|
| 580.30 | 0.00 | 580.30 | 580.30 |
Trans No: 5371Input: 9/23/26 8:02 AMBy: Webb
Customer
1200 Timber Road
Nacogdoches, TX 75961
Delivered
Stops
| # | Date Fr/To | Time Fr/To | PD | Company | Address | City, St |
|---|---|---|---|---|---|---|
| 1 | 9/22 | 07:00-09:00 | SHIP | Cedar Ridge Lumber | 1200 Timber Road | Nacogdoches, TX |
| 2 | 9/22 | 13:00-16:00 | CONS | Trinity Builders Supply | 2700 Lone Star Drive | Dallas, TX |
Commodities
| Code | Description | Reference | Pieces | Weight | Class | Hazmat |
|---|---|---|---|---|---|---|
| LUMBER | 2x6 SYP #2 16' | 22.00 | 44,000 | |||
Charges
| Code | Reference | Rate By | Rate | Units | Total | Payable | Notes |
|---|---|---|---|---|---|---|---|
| Freight | Flat | 505.30 | 505.30 | ||||
| Tarp | Flat | 75.00 | 75.00 | ||||
- Pieces
- 22.00
- Weight
- 44,000
- Freight
- 505.30
- Accessorials
- 75.00
- Total Revenue
- 580.30
Input: 9/21/26 2:14 PMBy: OrtizEdited: 9/22/26 6:05 AMBy: Ortiz
| Date | Name | Type | Reference | Amount | Memo |
|---|---|---|---|---|---|
| 09/14/26 | Lone Star Truck & Trailer | Bill | WO 1180 | 1,236.40 | Truck 2109 · A/C compressor |
| 09/24/26 | Gulf Coast Diesel Repair | Bill | 2,055.55 | Truck 2117 · transmission service | |
| 10/02/26 | Houston Shop | Work Order | WO 1186 | 868.43 | Truck 2111 · PM Service B |
| 10/05/26 | Gulf Coast Diesel Repair | Bill | WO 1184 | 2,785.26 | Truck 2106 · brake job |
| 10/07/26 | Gulf Coast Diesel Repair | Bill | WO 1185 | 4,314.50 | Truck 2127 · EGR cooler |
| 10/08/26 | Alamo Tire & Service Center | Bill | WO 1187 | 1,734.47 | Truck 2119 · drive tires |
Total: 241,734.92
Gulf Coast Diesel Repair
8120 Clinton Dr
Houston, TX 77029
| Account | Charge To | Amount | Reference | Location | Memo |
|---|---|---|---|---|---|
| 45000 | Gulf Coast Diesel Repair | 2,055.55 | WO 1183 | Truck 2117 · transmission service | |
| Total | Balance |
|---|---|
| 2,055.55 | 0.00 |
Trans No: 5402Input: 9/24/26 3:12 PMBy: WebbEdited: 10/20/26 9:05 AMBy: WebbLock: Payment
Click an account number on the statement, or pick a path.
06One system.
You’re doing everything twice. With ProBuilt, you do it once.
Most cloud TMSs bill the load, then send your books somewhere else. Alvys’s own help center calls QuickBooks “your accounting platform”, and you need a QuickBooks plan, Essentials or higher, for it to work. When QuickBooks rejects a transaction, it lands in an error queue for someone to fix and re-export. ProBuilt TMS has full accounting built in, in the same system as your loads. Nothing to sync. Nothing to re-export.
Two systems
Entered twice. Off by 72.00 in three places.
ProBuilt TMS
Entered once. The same 580.30 everywhere.
The books.
59% of accountants make several financial errors a month.
18% make one every day, and Gartner says they’re stretched too thin. Run dispatch in one system and accounting in another, and you’re doing everything twice. In ProBuilt TMS, dispatch and accounting are one.
Source: Gartner, 2024
The Accounting overview.
The whole back office. In one browser tab.
Eight minutes in ProBuilt TMS: billing, payables, payroll and every financial statement, all running from the same loads your dispatchers just ran.
Watch the first minute and a half, then tell us who’s watching to see the rest. One form opens every overview on the site.